Related Resources on Use Cases

 

Deployment Experience: Use Cases

Use Cases are the descriptions of smart grid applications that define the important actors, systems and technologies, and their requirements that are part of the smart grid applications. The Smart Grid Information Clearinghouse (SGIC) provides links and synopses to available smart grid-related Use Cases from trusted sources, such as EPRI Intelligrid and Southern California Edison (SCE). Use the tool below to browse available Use Cases by smart grid domain and year. The search results are sorted alphabetically by information source and title. The link from each Use Case title provides a brief description and the ability to download the full document.

Please note that all Use Cases available in the Clearinghouse are subject to Terms and Conditions set forth by the original repository owners, i.e. EPRI and SCE.


Filter
Smart Grid Domain
Year From
To
 


Search Results

274   results
Titlesort icon Source Year Post date
Adaptive Transmission Line Protection
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Advanced Distribution Automation with DER Function
EPRI Use Case Repository
2010
01/27/2010 - 17:16
AEP AMI Network
EPRI Use Case Repository
2012
01/24/2013 - 18:00
AEP Bulk Mtere Readings
EPRI Use Case Repository
2012
01/24/2013 - 18:16
AEP Circuit Reconfiguration
EPRI Use Case Repository
2012
01/24/2013 - 18:20
AEP Community Energy Storage (CES)- Energy Dispatch
EPRI Use Case Repository
2012
01/24/2013 - 18:25
AEP Configuration of a Community Energy Storage (CES) Controller
EPRI Use Case Repository
2012
01/24/2013 - 18:29
AEP Configuration of a Community Energy Storage (CES) Unit
EPRI Use Case Repository
2012
01/24/2013 - 18:32
AEP Customer Portal
EPRI Use Case Repository
2012
01/25/2013 - 13:19
AEP Data Warehouse- Utility’s Smart Grid Clearinghouse
EPRI Use Case Repository
2012
02/15/2013 - 18:03
AEP Demand Response HAN Device Provisioning
EPRI Use Case Repository
2012
01/25/2013 - 13:35
AEP Direct Load Control Event
EPRI Use Case Repository
2012
01/25/2013 - 13:23
AEP DR HAN Pricing & Event Customer Opt-Out
EPRI Use Case Repository
2012
01/25/2013 - 13:37
AEP In-Field Programming of Smart Meter and Meter Firmware Upgrade
EPRI Use Case Repository
2012
01/25/2013 - 13:43
AEP Integrated Volt VAR Control Centralized
EPRI Use Case Repository
2012
01/28/2013 - 13:45
AEP Integrated Volt VAR Control Decentralized
EPRI Use Case Repository
2012
01/28/2013 - 13:50
AEP On Demand Meter Reading from CIS
EPRI Use Case Repository
2012
01/29/2013 - 16:05
AEP Outage Management System Poll - Multicast
EPRI Use Case Repository
2012
01/30/2013 - 15:02
AEP Outage Management System Poll - Unicast
EPRI Use Case Repository
2012
01/30/2013 - 15:09
AEP Outage Notification
EPRI Use Case Repository
2012
01/31/2013 - 16:10
AEP Outage Restoration Notification
EPRI Use Case Repository
2012
01/31/2013 - 16:14
AEP Performing Real Time Price Auction
EPRI Use Case Repository
2012
02/04/2013 - 14:18
AEP Plug-In Electric Vehicle (PEV) Charging at Premise
EPRI Use Case Repository
2012
02/04/2013 - 14:23
AEP Post Real Time Price Auction Processing
EPRI Use Case Repository
2012
02/04/2013 - 14:25
AEP Real Time Price HAN Device Provisioning
EPRI Use Case Repository
2012
02/06/2013 - 15:29
AEP Real Time Price HAN Messaging
EPRI Use Case Repository
2012
02/06/2013 - 15:32
AEP Real Time Price System Initialization of Customer Enrollments
EPRI Use Case Repository
2012
02/07/2013 - 17:08
AEP Real Time Pricing (RTP) Billing
EPRI Use Case Repository
2012
02/04/2013 - 14:28
AEP Remote Meter Firmware Update
EPRI Use Case Repository
2012
02/06/2013 - 15:34
AEP Remote Programming of Smart Meter
EPRI Use Case Repository
2012
02/06/2013 - 15:35
AGC Frequency Control
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Alarm Management
EPRI Use Case Repository
2010
01/27/2010 - 17:16
AMI Network (Moving Data Elements from the AMI Head-End to Smart Meter & from the Smart Meter to the AMI Head-End) V3.0
EPRI Use Case Repository
2010
08/25/2010 - 12:33
Application Adjusts Load To Meet System Capacity Based On Settings From System Operator
EPRI Use Case Repository
2010
01/27/2010 - 17:16
As-Built Equipment Installation-Commissioning
EPRI Use Case Repository
2010
01/27/2010 - 17:16
As-Built Model Update - KCPL
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Asset Manager Verifies Equipment Location
EPRI Use Case Repository
2010
01/27/2010 - 17:16
Autonomous decentralized control of microgrid islanding mode
EPRI Use Case Repository
2012
12/22/2013 - 21:50
B1: Multiple Clients Read Demand and Energy Data Automatically from Customer Premises
Southern California Edison
2006
05/19/2010 - 16:50
B2: Utility Remotely Limits Usage and/or Connects and Disconnects Customer
Southern California Edison
2006
05/19/2010 - 16:53
B2G- Demand Response (DR)- Load profile management via pricing mechanisms
EPRI Use Case Repository
2011
02/19/2013 - 14:21
B2G- Demand Response (DR)- Load profile management via reliability based mechanisms
EPRI Use Case Repository
2011
02/15/2013 - 18:12
B2G- Load management with dynamic tariffs, DR and DER
EPRI Use Case Repository
2011
02/15/2013 - 18:07
B3: Utility Detects Tampering or Theft at Customer Site
Southern California Edison
2006
05/19/2010 - 16:54
B4: Contract Meter Reading (or Meter Reading for other Utilities)
Southern California Edison
2006
05/19/2010 - 16:58
BCTC - Operations to Planning v2
EPRI Use Case Repository
2010
01/27/2010 - 17:16
BCTC - Planning to Operations v2
EPRI Use Case Repository
2010
01/27/2010 - 17:16
BCTC - Planning to Planning v2
EPRI Use Case Repository
2010
01/27/2010 - 17:16
C1: Customer Reduces their Usage in Response to Pricing or Voluntary Load Reduction Events
Southern California Edison
2006
05/19/2010 - 17:00
C2: Customer has Access to Recent Energy Usage and Cost at their Site
Southern California Edison
2006
05/19/2010 - 17:01